# 99 59 73 73 99

ARYA ENTERPRISES
ARYA ENTERPRISES
  • Home
  • Services
  • PACKAGEs
  • Login
  • Gallery
  • How We Do ?
  • Material Supply
  • Contact Us
  • More
    • Home
    • Services
    • PACKAGEs
    • Login
    • Gallery
    • How We Do ?
    • Material Supply
    • Contact Us

# 99 59 73 73 99

  • Sign In
  • Create Account

  • Bookings
  • Orders
  • My Account
  • Signed in as:

  • filler@godaddy.com


  • Bookings
  • Orders
  • My Account
  • Sign out


Signed in as:

filler@godaddy.com

  • Home
  • Services
  • PACKAGEs
  • Login
  • Gallery
  • How We Do ?
  • Material Supply
  • Contact Us

Account


  • Bookings
  • Orders
  • My Account
  • Sign out


  • Sign In
  • Bookings
  • Orders
  • My Account

how We Do

Pre-Construction

Post-Construction

Pre-Construction

This phase includes constant monitoring and interaction. We keep an eye on budgets to ensure the lowest costs,  stay on top of schedules for timely delivery and work closely with the design team to create your vision.

Construction

Post-Construction

Pre-Construction

Working with trusted subcontractors, we keep them accountable throughout the entire build. From sequence to production and quality control, we stay focused on the goal. 

Post-Construction

Post-Construction

Post-Construction

The last step in any build. This phase includes site cleanup, systems training, final inspections and move-in coordination. After completion, we have a final walkthrough to ensure your complete satisfaction. 

4m-management concept

Machinery

Machinery

Machinery

"State-of-the-art Technology"

 "Latest Construction-Tech"

Manpower

Machinery

Machinery

Skilled/Unskilled Work force with EFFICIENT Workmanship 

"WELL TRANINED"

Material

Machinery

Material

Good quality Material Procurement with Assurance

"Efficient Supply Chain"

How Much to Manage at Construction Site...

Machinery

Machinery

Machinery

Any Construction Project require latest machinery to cut down the project cost and helps in maintaining the accuracy and quality of the project.



Equipment Required:


  • Earthmoving JCB
  • Concrete Millers
  • Concrete Pump
  • RMC/TM
  •  Vibrators 
  • Rammers
  • Total Station
  • Auto Level
  • Laser Equipment
  • Quality Check Equip.
  • Shuttering Materials
  • Cranes (Material  Handling Equip)
  • Borewells
  • Pumps/Motors
  • Safety Materials 
  • Scaffolding (GOWA)
  • Tools
  • Breakers
  • Chipping Machines
  • Grinders
  • Cutting machines
  • Paint mixing Equip
  • Compressors
  • Polishing Equip.
  • Drill Machines
  • Tractors
  • Piling Machines
  • Tankers
  • Rod bending Equip
  • Rod threading Equip
  • Lifts
  • Flood Lights
  • Trolleys Etc.,

Manpower

Machinery

Machinery

Any Construction Project require huge number of Quality Man Power for different departments and are categorized into Technical, Skilled and Unskilled.



Man Power Required:


  • Architects 
  • Civil Engineers
  • Surveyors  
  • Geologist
  • QC Dept. Team
  • Site Supervisors 
  • Project Managers
  • Accounts & Paper work
  • Drivers
  • Civil Masons
  • Centering Masons
  • Rod bending Masons
  • Electrical Teams
  • Plumbing Teams
  • Earth work Team
  • Concrete Team
  • Tiles laying Masons
  • Granite laying Mason
  • Marble Laying  Mason
  • Material shifting lab.
  • Fabricators SS/MS
  • Glass work Teams
  • Ceilings Designers
  • Elevation Workers
  • Painters
  • UPVC Contractors
  • Carpenters
  • Water Proofing Team
  • Polishing teams
  • Watch man 
  • Site Cleaning Labor
  • Scaffolding Teams  
  • Helpers Etc.,

Materials

Machinery

Materials

Any Construction Projects require good quality material as per Indian Standards Code of Construction, Which plays a major role in increasing the life of the Construction.


Materials Required:


  • TMT Steel
  • Cement
  • Sand (Slab/Plast/Fine)
  • Robo-Sand
  • 10mm/20mm/40mm
  • Bricks/Granite stones
  • Gravel (Murrum)
  • Water 
  • Binding wire
  • Ballies (Bamboo)
  • Tarpaulin-Ropes
  • Tadikas/Stands
  • Paints/Putty/POP
  • Wires/Cables
  • Switches
  • PVC Pipes/Fittings
  • CPVC Pipes/Fittings
  • PVC SWR Pipes/Fittings
  • PVC Over Head Tanks
  • Sanitary Products 
  • UPVC Windows
  • Teak Wood BT/MT
  • WPC Door frames
  • Skin /WPC Doors
  • Doors hardware
  • Locks/All drops
  • Glass & Fittings
  • Iron & Stainless Steel
  • Water Proofing chemicals
  • Construction chemicals
  • Granite & Marble
  • Tiles & Chemicals
  • Motors/Panel/Metal box
  • Parking tiles
  • LIFT Etc.,

4M is Money

Monetary

Last but not the least, this plays a major role in deciding the Cost ,Quality, Quantity and Time line of any Construction project.


As the time is the Essence of any Construction Contract.


Timely transactions and Managing the Cash flow is the challenging task to manage the above Deciding Factors for Quality Out Put .